[Nov 17, 2021] New 2021 PMI PMI-PBA Exam Dumps with PDF from PDFDumps (Updated 202 Questions) [Q49-Q74]

Share

New 2021 PMI-PBA exam questions Welcome to download the newest PDFDumps PMI-PBA PDF dumps (202  Q&As)

P.S. Free 2021 PMI Professional in Business Analysis PMI-PBA  dumps are available on Google Drive shared by PDFDumps

NEW QUESTION 49
The business analyst generated a design specification for a new product. What is the best type of formal review to conduct with the customer to establish an approved requirements baseline?

  • A. Production readiness review
  • B. Critical design review
  • C. System requirements review
  • D. Test readiness review

Answer: C

 

NEW QUESTION 50
A company is working on implementing a software application. They are converting their complex, m-house processes into the new system. The business analyst has been asked to analyze the processes.
Which technique should be followed?

  • A. MoSCoW
  • B. Feasibility analysis
  • C. Interface analysis
  • D. Requirements traceability

Answer: C

 

NEW QUESTION 51
Which function involves auditing both the quality requirements to resolve discrepancies and the results of quality control measurements to ensure that appropriate quality standards and operational definitions are being used?

  • A. Quality management
  • B. Quality control
  • C. Quality assessment
  • D. Quality assurance

Answer: D

 

NEW QUESTION 52

A company uses a prioritization range of 1-10. in which 10 represents the highest or best. According to the information from the table, which option should the business * analyst recommend?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: C

 

NEW QUESTION 53
When determining the value of a business case, which tool or technique should be used?

  • A. Cost-benefit analysis
  • B. Variance analysis
  • C. Feasibility analysis
  • D. SWOT analysis

Answer: A

 

NEW QUESTION 54
Which tool is the most appropriate to aid in development of measurable and actionable requirements for a new project?

  • A. Activity-on-node diagram
  • B. Network diagram
  • C. Entity relationship diagram
  • D. Use case diagram

Answer: D

 

NEW QUESTION 55
A type of requirements document that would be the most valuable to a database administrator would be:

  • A. an object diagram.
  • B. an entity relationship diagram.
  • C. a data flow diagram.
  • D. a business process diagram.

Answer: B

Explanation:
Explanation/Reference: https://www.smartdraw.com/entity-relationship-diagram/

 

NEW QUESTION 56
What can a business analyst use to track requirements documentation?

  • A. Data dictionary
  • B. Affinity diagram
  • C. Version control system
  • D. Business rules matrix

Answer: C

 

NEW QUESTION 57
A national company with offices in every stale in the country has deployed a solution to allow employees to view their health benefits online. The business analyst on the project team is validating solution results to assess whether or not the solution has achieved the desired business result.
Which is the best technique to gather information from employees regarding their satisfaction with the solution?

  • A. Organization modeling
  • B. Focus groups
  • C. Interface analysis
  • D. Survey

Answer: D

 

NEW QUESTION 58
A business analyst has been assigned to a project team that is redesigning the company's website The business analyst has been documenting the relationships between requirements and has found requirements that do not trace to a business need.
Which type of requirements are these?

  • A. Out-of-scope
  • B. In-scope
  • C. Tested
  • D. Implemented

Answer: A

 

NEW QUESTION 59
A company is developing a new product for a customer and is required to verify and validate the product against the customer's acceptance test plan and requirements. The product was successfully verified against the acceptance test criteria, but the customer does not believe that the product meets the requirements.
This occurred because the customer's acceptance test plan:

  • A. was not formally accepted by the company.
  • B. was incomplete and missing requirements.
  • C. did not have measurable and testable requirements.
  • D. was not included in the work breakdown structure.

Answer: A

 

NEW QUESTION 60
A sponsor requests a new requirement The business analyst explains that most of the information needed for this requirement does not exist and that the requirement cannot be implemented. The business analyst recommends deferring the requirement until the needed information is available and then adding it to a subsequent project The sponsor agrees.
What should the business analyst do next?

  • A. Bring the subsequent project to the change control board (CCB).
  • B. Ask the stakeholders to review the requirement before any other action is taken.
  • C. Communicate that the status of this requirement has changed.
  • D. Mark the requirement as complete so that it is not forgotten.

Answer: B

 

NEW QUESTION 61
An organization is evaluating the possibility of conducting business internationally. Which factors should be investigated at the onset of the initiative?

  • A. Impacts on requirements baseline
  • B. Change control processes
  • C. External dependencies
  • D. Deliverables to be produced

Answer: C

 

NEW QUESTION 62
A company is developing a new risk management system. The company expects the system to evolve in the near future due to changing government regulations. Which approach will better cope with the requirements' volatility?

  • A. Multivoting
  • B. Comparative analysis
  • C. Phased baselmmg
  • D. Storyboarding

Answer: C

 

NEW QUESTION 63
A project team has been assembled to reduce production costs. The business analyst is working with the project team to review and approve requirements. A stakeholder from the assembly line area has an issue with one of the requirements since it is dependent on using existing equipment that is set to be retired within the next six months.
Which of these techniques would the business analyst use to manage issues identified by stakeholders with requirements to ensure that those issues are resolved?

  • A. Process modeling
  • B. Problem tracking
  • C. Interviews
  • D. Estimation

Answer: B

 

NEW QUESTION 64
When a business analyst uses subject matter experts to define roles and identify influencers. which project artifact is created or updated?

  • A. Stakeholder management plan
  • B. RACI matrix
  • C. Stakeholder register
  • D. SWOT analysis

Answer: C

 

NEW QUESTION 65
The project team has all the document control process and versioning in place to capture the requirements changes. The team ensures that the change is documented in the scope document, resulting in the changed work breakdown structure (WBS) and schedule. However, a key requirement was not implemented in the release.
Which is a possible reason why the requirement was not implemented?

  • A. The requirements traceability matrix was not updated with the change.
  • B. The requirements management plan was not updated with the change.
  • C. The schedule management plan was not updated with the change.
  • D. The scope management plan was not updated with the change.

Answer: D

 

NEW QUESTION 66
A new business analyst has taken over on a project that is in the development phase. The project manager is looking for an update on requirements status.
What should the business analyst use to help communicate the status?

  • A. Communication plan
  • B. Traceability matrix
  • C. Project charter
  • D. Business analysis plan

Answer: B

Explanation:
Traceability and Monitoring domain includes the activities related to managing the life cycle of requirements.
The tasks within this domain comprise the continuous monitoring and documenting of requirements as well as the communication of the requirements status to stakeholders.

 

NEW QUESTION 67
A business analyst needs to estimate the effort associated with project requirements. However, the lack of detail is concerning. What technique could the business analyst use to help alleviate this concern?

  • A. Business analysis work plan
  • B. Decomposition model
  • C. Context diagram
  • D. Swimlane diagram

Answer: B

 

NEW QUESTION 68
Several interviews with stakeholders to develop an inventory management system in a new architectural environment have revealed a significant concern about system and architectural stability. In which tool should the business analyst include this attribute to ensure that the requirement meets the acceptance criteria?

  • A. Process modeling
  • B. Stakeholder satisfaction survey
  • C. Interface analysis
  • D. Traceability matrix

Answer: C

Explanation:
Explanation/Reference: https://www.businessanalystlearnings.com/ba-techniques/2014/5/31/interface-analysis

 

NEW QUESTION 69
A business analyst is trying to determine which analysis technique will be best suited to elicit information from a large number of users in a short period of time. Which elicitation technique is best suited for this purpose?

  • A. Questionnaire
  • B. Facilitated workshop
  • C. Group brainstorming
  • D. Ongoing observation

Answer: A

 

NEW QUESTION 70
Which document best provides the boundaries for product development?

  • A. Requirements baseline
  • B. Scope document
  • C. Project plan
  • D. Scope definition

Answer: B

Explanation:
Explanation/Reference: https://www.pumpsandsystems.com/general-scope-document-project-boundaries

 

NEW QUESTION 71
A business analyst is working on a highly complex project and has elicited a large number of requirements from stakeholders in several departments Due to the large number of requirements, the stakeholders have determined that they would like to prioritize them to minimize a potentially large scope.
Which technique could the business analyst use to manage requirements?

  • A. RACI models
  • B. Storyboarding
  • C. SMART goals
  • D. MoSCoW

Answer: D

 

NEW QUESTION 72

  • A. Requirement changes were not properly identified in the project charter.
  • B. The product was not adequately tested in accordance with the test plan.
  • C. The product design was not properly reviewed by the quality department.
  • D. The requirements matrix did not adequately track back to client requirements.
  • E. Company A designed and successfully tested the new product against the test plan, yet the client does not agree that it meets the specification.
    What could have caused this?

Answer: A

Explanation:
Explanation

 

NEW QUESTION 73
A company has just finished the development work for a new software sales tracking application and is in the process of validating that the new application meets all of the acceptance criteria defined for the business requirements. During the validation process, a stakeholder discovers that the application does not provide the selection criteria needed to produce the sales volume reporting required by the company's financial department. The business analyst for the project determines that the selection criteria needed was not specified in the system requirements or design specifications.
Which of the following tools and/or techniques might be used by the business analyst to determine how the selection criteria requirement was missed?

  • A. Cause and effect diagram, brainstorming, and/or the Five Whys
  • B. Root cause analysis, problem tracking, and/or benchmarking
  • C. Scope modeling. Ishikawa diagram, and/or the Five Whys
  • D. Root cause analysis, fishbone diagram, and/or the Five Whys

Answer: D

 

NEW QUESTION 74
......

PMI-PBA exam questions from PDFDumps dumps: https://www.pdfdumps.com/PMI-PBA-valid-exam.html (202  Q&As)

Free 2021 PMI Professional in Business Analysis PMI-PBA dumps are available on Google Drive shared by PDFDumps: https://drive.google.com/open?id=1WTCrmof3sO6VCHsvJYY2Dgt9o0nobv-c